Gas Unit Installation in Steel Industry Facility

Gas Unit Installation in Steel Industry Facility

Year: 2014

Operation:
Overland haulage, load out, erection of vessels and tanks. Lifting and posicioning of cold boxes onto base.

Highlight:
The gas unit at the steel plant in Belo Horizonte aims at supplying the steel pipes production. Investiment for the purpose of facilitating and reducing costs of the plant's manufacturing process.

Transdata assisted the equipment installation by carring on overland haulage, load out and cold boxes lifting.

Belo Horizonte facility has the annual production capacity of 550 thousand tons of steel pipes from 1-14 inches.

SPECIFICATIONS

Origin: Rio de Janeiro (RJ)
Destino / Local: Belo Horizonte (BH)
Cargo Dimensions:
Cold box 31.42 x 05.78 x 04.49 meters - 196 tonnes
Cold box 32.30 x 05.78 x 04.49 meters - 164 tonnes
02 X Vessel 07.53 x 05.45 x 05.04 meters - 39 tonnes
03 X Tank 16.71 x 04.31 x 04.14 meters - 41 tonnes
01 X Tank 12.60 x 03.14 x 03.49 meters - 21 tonnes
01 X Tank 06.05 x 02.35 x 02.55 meters - 08 tonnes
Main Equipment:
600-tonne Crawler Crane
250-tonne Crawler Crane